Have a project in Austin?
Our Austin SWPPP services are designed to get your project started and ensure compliance with state and City of Austin SWPPP requirements. A Stormwater Pollution Prevention Plan, also known as a SWPPP, SWP3, or SW3P, is a site-specific document that identifies:
- – The scope of the project.
- – The operator(s) who are responsible for implementing the Stormwater Pollution Prevention Plan.
- – Potential sources of stormwater pollution at the construction site.
- – The measures that will be implemented to contain on-site pollutants and prevent them from being carried off-site in the form of runoff during storms.
Any construction site that disturbs one or more acres, or is part of a Larger Common Plan of Development as regulated under the Texas Commission on Environmental Quality (TCEQ) Construction General Permit No. TXR150000, is required to develop a SWPPP and obtain permit coverage.
- 1. Develop a Stormwater Pollution Prevention Plan (SWPPP)
- 2. Prepare your TCEQ TXR150000 authorization by completing a Small Site Notice or Notice of Intent application and submit it to the City of Austin.
- 3. Implement your SWPPP by installing the proposed erosion and sediment control plan and posting all required notices
- 4. Schedule your preconstruction meeting at austintexas.gov. The City of Austin requires an on-site preconstruction meeting to ensure that temporary erosion and sediment controls are installed and consistent with approved plans.
- 5. Conduct the required inspections and perform maintenance on any deficiency items found during the inspection
A copy of the City’s ordinance and Environmental Criteria Manual can be found at municode.com. Unsure what jurisdiction your property falls within? Use the City of Austin Jurisdictions Web Map.
- 1. Develop a Stormwater Pollution Prevention Plan (SWPPP)
- 2. Prepare your TCEQ TXR150000 authorization by completing a Small Site Notice or Notice of Intent application
- 3. Residential projects need to upload a SWP3 Summary Form and a copy of their TCEQ TXR150000 authorization to their MyGovernmentOnline Account. All other projects will need to upload a SWPPP and TCEQ authorization to their MyGovernmentOnline Account.
- 4. Implement your SWPPP by installing the proposed erosion and sediment controls plan and posting all required notices.
- 5. Schedule your preconstruction meeting with Travis County Environmental Quality. An on-site preconstruction meeting is required to discuss construction activity requirements and to ensure that temporary erosion and sediment controls are installed in accordance with approved plans. Residential projects are typically exempt from the preconstruction meeting requirement.
- 6. Conduct the required inspections and perform maintenance on any deficiency items found during the inspection.
A copy of the Travis County Code for development can be found at traviscountytx.gov. Unsure what jurisdiction your property falls within? Use the City of Austin Jurisdictions Web Map.
How can Smart SWPPP help?
Smart SWPPP offers a streamlined approach to getting your SWPPP developed and notices submitted within 72 hours. We also offer a wide range of other services to meet your compliance needs in Austin and Travis County. Let us help you save time and resources on your next project.
Getting started is easy
2
Fill out the project information form and upload your plans
After submitting your order, you’ll receive an email to upload your plans
3
48 to 72 hours later, you’ll receive your SWPPP
Need it faster? Please contact us; we’re here to help you get your project started.
Small Site SWPPP
For projects less than 5 acres
$499
Includes
Prepared TCEQ Construction Site Notices
Sign and complete all documents electronically
Submittals to City of Austin or Travis County to start and end project
72 hour turnaround time
Large Site SWPPP
For projects 5 acres and up
$549
Includes
Prepared TCEQ Notice of Intent application
Prepared TCEQ Construction Site Notices
Submittals to City of Austin or Travis County to start and end project
72 hour turnaround time
TCEQ Notice of Intent
Prepared permit application
$99
Ideal for
Projects that have a SWPPP but need their TCEQ TXR150000 Permit
Includes
Prepared TCEQ Construction Site Notices
Submittals to City of Austin or Travis County to start and end project
48 hour turnaround time
Need a custom solution for your project?
Call 1-888-363-0022
Ideal for
Developers and home builders with multiple projects
Multi-phased developments
Small Site SWPPP
For projects less than 5 acres
Large Site SWPPP
For projects 5 acres and up
TCEQ Notice of Intent
Prepared permit application
Need a custom solution for your project?
$499
$549
$99
Call 1-888-363-0022
Includes
Prepared TCEQ Construction Site Notices
Includes
Prepared TCEQ Notice of Intent application
Ideal for
Projects that have a SWPPP but need their TCEQ TXR150000 Permit
Ideal for
Developers and home builders with multiple projects
Up to 20% off at checkout
Sign and complete all documents electronically
Submittals to City of Austin or Travis County to start and end project
72 hour turnaround time
Up to 20% off at checkout
Prepared TCEQ Construction Site Notices
Submittals to City of Austin or Travis County to start and end project
72 hour turnaround time
Includes
Prepared TCEQ Construction Site Notices
Submittals to City of Austin or Travis County to start and end project
48 hour turnaround time
and
Multi-phased developments
Small Site SWPPP &
Erosion and Sediment Control Plan
For projects less than 2 acres
$849
Ideal for
Build on your lot projects
Includes
Prepared TCEQ Construction Site Notices
Sign and complete all documents electronically
Submittals to City of Austin or Travis County to start and end project
Five day turnaround time
Small Site SWPPP
For projects up to 2 acres
Erosion and Sediment Control Plan
$849
Ideal for
Build on your lot projects
Includes
Prepared TCEQ Construction Site Notices
Submittals to City of Austin or Travis County to start and end project
Five day turnaround time
Frequently Asked Questions for Austin and Travis County
- – in separate stages
- – in separate phases
- – in combination with other construction activities
- – plats
- – blueprints
- – marketing plans
- – contracts
- – building permits
- – public notice or hearing
- – zoning requests
It can include one operator or many operators.
Example: A subdivision is being developed. You are building homes on 2 acres, another company is clearing 3 acres in the next phase, and a contractor is excavating another 0.5 acres for a pond. In this case, the total area that would be disturbed is 5.5 acres. As a result, each operator would be subject to the requirements associated with disturbing 5 or more acres.
“Construction” refers to actions that result in a disturbance of the land, including clearing, grading, excavating, and other similar activities.
It also includes “construction-related activities,” areas that support the construction project such as stockpiles, borrow areas, concrete truck washouts, fueling areas, material storage areas and equipment storage areas. Construction activities that do not disturb land, such as interior remodeling, generally do not require TPDES or NPDES permit coverage.